The so-called crushing ratio is expressed as the ratio of the largest block size in the crusher 's feed to the largest nugget size in the broken product. In the middle    i - the ratio of crushing;            D - the largest block size in the broken feedstock, mm;        d - the largest block size in the broken product, in millimeters. The so-called maximum block size of the material is often expressed as the size of the mesh that can pass 95% of the material. The size of the crushing ratio indicates the multiple of the particle size reduction after each section of the ore is crushed. For example, the maximum size of a certain medium crusher crusher is Each crushing stage has a crushing ratio called phase crushing ratio. The total crushing ratio (i.e., the ratio of the largest block size of the raw ore fed to the coarse crusher to the most granular size of the final crusher product) is equal to the product of the crushing ratios of the segments. i total = i 1 , i 2 , i 3 , ...                                           Where i is the total broken ratio; i 1 , i 2 , i 3 , ... - the crush ratio at each stage.
1.Application : For bicycle frame
OD
OD Tolerance
ID
Tolerance
Roundness
Straightness
Circular
run-out
φ16-20
±0.02
±0.02
0.01↓
0.015↓
0.05↓
φ20-30
±0.02
±0.02
0.01↓
0.015↓
0.05↓
φ30-50
±0.05
±0.05
0.02↓
0.020↓
0.08↓
φ50-80
±0.15
±0.10
0.05↓
0.025↓
0.10↓
7. Trade Terms Drawn Tube For Bicycle Frame,Bicycle Frame,Aluminum Drawn Tube For Bicycle,Bicycle Aluminum Drawn Tube Changzhou YiFei Machinery Co., Ltd. , https://www.yifeialu.com
.
The crushing ratios that can be achieved by the crushing and grinding equipment currently used are roughly as shown in the following table.
2.Dimension: Customized dimension, OEM & ODM
3.Material: A6063, A6061, A3003 and other series alu alloy
4.Suface treatment: Anodizing, polishing, turning ,power coating, mill finish etc
5.Equipment: CNC ,extruding machine, cold drawn machine, heating oven, straightening machine, cutting machine
6. STANDARD PACKING:Wooden case/carton
1. Payment: 30% T/T in advance, 70% balance pay before delivery. L/C at sight.
2. Delivery time: 20 days after deposit receiverd. If opening mould, plus 7-10 days.
3. Trade Term can be chosen depending on your requirements.
4. FOB Port: Shanghai
Broken ratio concept